We completed the electrical building services work for a wind farm substation.
Services & Expertise
• Project Management
• Containment
• Cable Installation
• Earthing
• LV Cable Jointing
• 11 KV Cable Jointing
• 33 KV Cable Jointing
• Sheath Testing
• Insulation Resistence Testing
• VLF Testing
• Building Services
• ATEX Installation
Further Infomation
The aim of the project is to enable Creag Riabhach Wind Farm to connect to SSE's transmission network.
Creag Riabach Facts and Figures:
• 22 turbines
• Total installed capacity of up to 92.4MW
• 125m ground to blade tip
• 291,000 MWh of electricity per year
• Secured a 10-year PPA with Engie for both Sandy Knowe and Craiggore wind farms.
• Potential to power up to 75,000 homes annually and reduce CO2 emissions by 130,950 tonnes
• Recovered more than 400 hectares of peatland